Forum
User Forum

Free Content
Bibliography
Constants
Economics Articles
Glossary of Terms
History of the IC
Misc. Technology
Technology Trends
Useful Links

Strategic Partners
IC Insights
Lattice Press
Semiconductor Insights
Sigenics
Threshold Systems

Featured Products
2008 IC Cost Model
2008 IC Economics
2007 IC Packaging
2008 IC Technology
MEMS Cost Model
Cleanroom Guide
300mm Watch
Solar Watch
Visual Equipment Guide

Contact Us
IC Knowledge
PO Box 20
Georgetown,
MA 01833
info@icknowledge.com
Tx: (978) 352-7610
Fx: (978) 352-3870

Navigation Bar: Home > Economics Articles > 300mm Transistion_Oct

Introduction
Figure 1 presents the cumulative number of 300mm Fabs currently announced, under construction or in production by year (green bars). Figure 1 is up-to-date as of October 1st, 2001 and includes data on 48 projects tracked in the IC Knowledge database (some are on-hold or canceled). Since our August update 4 Fabs due to eneter use in 2002 have been canceled or put on hold and 1 Fab due in 2003 has been delayed to 2004. Previously we were surprised at the strength of 300mm construction activity given the current downturn. The current push-outs are likely to be the beginning of an overdue correction.

Figure 1. 300mm wafer transition.

Related articles

Copyright © 2000 - 2004 IC Knowledge - all rights reserved.